PARQ

Property guide

Can I Put a Park Model on My Property?

The short answer: owning land does not automatically mean a park model RV may be placed or used there. Local planning rules decide. Start with permission, then study access, ground, utilities and the work required to make the setting practical.

Park model RVs are designed for recreational and seasonal use, not as permanent residences. Parq is in prelaunch, launching in 2027 from Kechi, Kansas.

Begin with the rulebook

Ownership is not the same as permission.

Property ownership answers who controls the land. It does not answer which structures or vehicles may be placed there, how they may be used, or how long they may be occupied. Those questions are governed by public land-use rules and, sometimes, private restrictions tied to the parcel.

A county may treat a park model differently from a city inside that county. A rural parcel may still have sanitation, floodplain or road-access requirements. A campground may allow park model RVs under an operating approval that does not apply to an individual residential lot. An association or recorded covenant may be more restrictive than the public zoning.

The practical first step is not choosing a floor plan. It is identifying the office or authority responsible for the parcel and describing the proposed use accurately. Ask about a park model RV intended for recreational or seasonal use. Avoid assuming that a rule for a mobile home, manufactured home, travel trailer, tiny house or accessory dwelling unit applies to the park model category.

Local staff can explain the process, but a conversation is not an issued permit. Ask where the applicable rules are published, what applications are required and which facts about the parcel or unit they need. If the answer is uncertain, a local land-use professional can help interpret the requirements. Parq can help organize site information, but cannot grant permission or make a legal conclusion for a jurisdiction.

Use the right name

Park model RV, manufactured home and ADU are different paths.

A park model RV is a factory-built recreational vehicle designed for recreational and seasonal use. It is not represented as permanent housing. That intended use matters when a planner evaluates where the unit may go and whether a proposed pattern of occupancy fits local rules.

A manufactured home is built to a federal housing standard for permanent residential use. Its construction standard, title, installation and approval pathway differ from those of a recreational vehicle. Similar proportions or factory construction do not make the categories interchangeable.

An accessory dwelling unit, often called an ADU, is a land-use and housing category defined by local law. A jurisdiction may specify what can qualify, who may occupy it, where it may sit and which building standards apply. Calling a park model an ADU does not make it one, and Parq does not promise that a park model will satisfy any local ADU ordinance.

Read the fuller park model guide before contacting planning staff. Clear category language leads to clearer answers and reduces the risk of planning around a rule that applies to a different kind of home.

Before choosing a model

A planning-office checklist.

Bring the parcel address or legal description, a simple description of the proposed recreational or seasonal use, and questions that invite specific answers.

Who has jurisdiction?

Identify whether the city, county, township, campground, community association or another body controls land use. A mailing address alone may not tell you which office makes the decision.

How is the parcel zoned?

Ask for the zoning district and the uses allowed in it. Use the phrase park model RV rather than a general phrase such as tiny home, because those categories may be treated differently.

What kind of use is allowed?

Ask whether recreational or seasonal placement is allowed, where on the parcel it may sit, and whether rules limit occupancy periods. Do not assume that permission for an RV means permission for every use.

What approvals come before delivery?

Ask about permits, setbacks, floodplain review, sanitation approval, electrical inspection, access review and any documents needed before site work begins.

Do private restrictions apply?

Deed restrictions, easements, covenants, campground rules and association documents may matter even when public zoning appears favorable. Review them with an appropriate local professional.

What should be documented?

Keep the names of the offices contacted, the questions asked and written responses or application requirements. Verbal guidance is useful, but the applicable written rules and issued approvals govern.

Stay close to launch

Join the priority list.

Share your name and email. We’ll contact you in signup order as plans take shape.

I am asking Parq to contact me about my interest. Parq records my details and the order they were received, and uses them only for outreach about Parq park models. This is not a purchase, a reserved unit or a delivery date.

After the zoning question

Permission opens the next set of questions.

Access. A park model arrives as a wide load. Road width is only one part of the route: turns, gates, bridges, overhead lines, trees, slopes, soft ground and the final approach all matter. A transport professional needs to assess the route before delivery can be planned.

Pad and support. The unit needs a level, stable setting suited to the parcel and local requirements. Soil, drainage, frost conditions and slope influence the support approach. This is locally designed site work, separate from the factory-built unit.

Utilities. Locate water, sewer or septic and electrical service before choosing the final spot. Distance, trenching, capacity and inspection requirements can change the practical site plan. On raw land, utility planning may be more involved than the unit selection.

Backyard privacy. A workable backyard plan also considers windows, neighboring views, shade, drainage, paths and outdoor space. Screening and a site-built deck can make a retreat feel settled, but they do not change the use the local rules permit.

The companion all-in budget guide separates the unit, delivery and site-work layers without publishing a Parq price. That same separation helps owners ask the right professionals for the right scope.

Place changes the plan

Four settings, four different conversations.

These are planning patterns, not jurisdictional answers. Each parcel still needs its own review.

Backyard

Utilities may be close, but setbacks, neighboring privacy, gate width and the route around an existing house can be decisive. Plan views, screening and outdoor space without treating the park model as an automatic ADU.

Explore backyard placement

Farm

Open land can simplify maneuvering while increasing utility distance. Check the access lane, bridge or culvert capacity, drainage, well and septic conditions, and whether agricultural zoning allows the proposed recreational use.

Explore farm placement

Lake

Shoreline setbacks, floodplain rules, slope, drainage and sanitation can shape the usable area. A beautiful view does not replace a buildable, reachable and locally permitted location.

Explore lake placement

Mountains

Grades, switchbacks, overhead clearance, seasonal weather and retaining work can affect whether transport is practical. Local engineering and transport review may be needed before a placement plan is credible.

Explore mountains placement

Compare all placement settings, including the dedicated backyard guide.

From vision to arrival

Factory work and site work move together.

A clear sequence keeps permission, procurement and local work from being mistaken for one package. Every parcel and project is different; these are general stages, not a promised schedule.

  1. 01

    Plan

    Clarify the intended recreational or seasonal use, confirm the product category, choose a direction and identify the local approvals that govern the parcel.

  2. 02

    Site Prep

    Prepare access, drainage, support and utility routes through local professionals after the relevant requirements are understood.

  3. 03

    Factory Build

    The park model itself is built and finished in a controlled factory setting according to the selected plan and confirmed factory options.

  4. 04

    Transport

    A transport professional reviews the route, permits, turns, gates, overhead clearance and final approach before moving the wide load.

  5. 05

    Set-Up

    The unit is placed and leveled, then local trades complete connections and separately scoped items such as skirting, steps or outdoor living work.

The factory builds the park model. Local professionals prepare the land, connect services and complete separately scoped outdoor work. Transport sits between those scopes and depends on a viable route and prepared destination.

Planning multiple retreats, shared amenities or a hospitality setting adds circulation, utility capacity, phasing, operations and broader approvals. Start with the Parq destinations pathway rather than treating a multi-unit concept as a larger backyard placement.

What prelaunch means

What Parq can — and cannot — do now.

Parq can

Share educational planning questions, explain the distinction between factory and site scope, discuss the proposed Parq collection, record interest in signup order and receive details about a parcel for a future conversation.

Parq cannot

Approve a parcel, interpret local law, promise permanent-residence or ADU eligibility, replace a planner or local professional, confirm delivery before route review, or turn general guidance into a site-specific conclusion.

Parq is launching in 2027 from Kechi, Kansas. Joining the priority list is free and reserves nothing. It asks Parq to contact you about your interest as plans firm up.

Common questions

Before you plan the placement.

Does owning land mean I can place a park model there?
No. Ownership gives you control of the parcel, but land-use rules still govern what may be placed there and how it may be used. Ask the city, county, community or other authority with jurisdiction over the property before making a commitment.
Is a park model RV the same as a manufactured home or an ADU?
No. A park model is built as a recreational vehicle for recreational and seasonal use. Manufactured homes are built to a federal housing standard, while an ADU is a local land-use category. Each follows a different approval path.
Can a park model be used as a permanent residence?
Park model RVs are intended for recreational and seasonal use. Parq does not represent them as permanent residences. Local rules determine allowed placement, occupancy and duration of use.
What should I ask the local planning office?
Describe the unit accurately as a park model RV and ask about permitted use, zoning, setbacks, duration of occupancy, utility requirements, permits, inspections, access and any recorded restrictions that may apply.
What if local placement appears possible?
Then assess delivery access, ground and drainage, the support system, utilities and outdoor work. Keep factory-built scope separate from locally designed and installed site work.
How can I start a conversation with Parq?
Join the priority list to hear from Parq in signup order as plans firm up, or tell the team about your parcel through the landowner form. Neither step reserves a home or confirms that a site is permitted.

A considered first step

Begin with the land. Stay close to what comes next.

Join the priority list for Parq updates in signup order, or share the practical details of your property with our team.

Park model RVs are intended for recreational and seasonal use, not as permanent residences. Local rules decide placement and allowed use. Confirm zoning, permits, sanitation, access and occupancy requirements with the authority responsible for your property before buying or preparing a site.